VERDE SERVICES: Proven In Delivery

13 November 2026

Verde Services can take decarbonisation projects in the M&E space from concept to commissioning. The company is building a reputation for quality and reliability as it continues to rollout significant works in the UK northwest. Head of Commercial, Ryan Dwyer, tells Energy Focus that the future looks bright for this growing and ambitious group.

Supported by:

Burns McDonnell

Liverpool’s public buildings are learning to keep warm without gas. Across the city region, a programme worth more than £40m is decarbonising 35 public buildings, with waterfront landmarks including Georges Dock and the Cunard Building connecting to a heat network that draws its energy from the Leeds and Liverpool Canal. Solar panels are going onto 14 of the sites, adding 1.2 MW of renewable capacity, and the programme is expected to save around 21,500 MWh of energy every year. Schemes of this size need engineers who can design the new systems and fit them properly, and Verde Services has become one of the names that main contractors call.

Verde is a family-run mechanical and electrical contractor focused on decarbonisation. The company designs and installs new systems across the large energy-using departments of corporate and public sector buildings, from heating and cooling to the electrical infrastructure that supports them. Working from Liverpool and taking on projects well beyond it, Verde is still a young business, yet it already delivers for some of the largest corporate contractors in the country.

In September 2025, Founder and Managing Director, Luke Dwyer, explained that the ambitious business was already making its mark, scaling fast as a relative newcomer. Now, Head of Commercial Ryan Dwyer says the picture has moved on, and the company is now an established player, lauded as the country’s Best Mechanical and Electrical Contractor at the Sunday Express Construction and Property Awards at a high-profile ceremony in Manchester in May 2026. 

“Since then, business has been very good, and everything has been very positive. We have seen huge growth in the business and we have shown very strong accounts with momentum continuing through 2025 and 2026,” says Dwyer. “We are certainly becoming a specialist partner that is recognised on the map.” 

The numbers back him up. “We increased our year-on-year revenue for the financial year ending March 2026 and we are forecast to grow again by the end of March 2027,” Dwyer explains. “Without a big change in the number of people employed, we are really pleased with these results and we think it shows that what we are doing is working.” 

By keeping the team fresh, Verde is fuelling its momentum. “We have added some new faces to the team and that has been a very good evolution, adding more skills to the group which will result in more revenue and turnover growth.”

PUBLIC SECTOR PIPELINE

Much of the growth has come from the Public Sector Decarbonisation Scheme, the government-funded programme that pays for low-carbon heating and energy-saving measures in public buildings. Liverpool City Region’s share of the funding supports the Combined Authority’s goal of net zero by 2035, and the work is handled in layers, with large contractors appointed to run each package and specialist delivery partners brought in to do the engineering. 

Verde positions itself as a delivery partner to the country’s big contractors, and boasts a team of experienced engineers and project managers that know how to get things over the line. “We have worked a lot on Public Sector Decarbonisation Scheme 3 (PSDS3) to decarbonise buildings. That helped us to build a strong pipeline in the past year,” says Dwyer. “That initiative will continue to be a big part of what we do for the next 12 months. PSDS4 has been approved and that is the next scheme that we will be helping to deliver for main contractors.” 

The offer that wins work for Verde is all-encompassing, showcasing a range of skills and knowledge from an experienced team. “We have become a trusted delivery partner who can handle design, feasibility, and build – a turnkey package for the main contractors. It gives them confidence that the work will be completed to the highest standard, and that is why we are growing so quickly.” 

That reputation has travelled well. Earlier this year, the company was onsite in Liverpool for a local housing association. At the company’s office building, Verde was contracted as the main mechanical and solar sub-contractor with a scope of stripping-out existing services before installing domestic water services, above ground drainage, ventilation, air conditioning and solar. This included the replacement of an ageing variable refrigerant flow system (VRF). The project was particularly challenging because of the structural composition of the building with steelwork within ceiling voids, alongside ductwork and ventilation, making fixing mechanical infrastructure difficult. A redesign was proposed and accepted by all partners, with Verde revamping ceiling heights, ducting, lighting, fire/smoke systems, before installing solar panels, new pipework, new fan coil units, and various other improvements. 

A brand-new Daikin high efficiency heat recovery system was crane lifted into place to complement the wider modernisation project that was delivered within budget. Highly relevant for Verde, heating remains one of the biggest contributors to building emissions and renewing systems with innovative technology allows for vastly improved sustainability credentials.

“Modern heat recovery and heat pump technology helps capture energy that would otherwise be wasted, supporting a more sustainable approach to building services,” says Dwyer. 

Working with reputable clients on projects of scale brings steadier relationships as well as bigger contracts. “A lot of the work we are doing is repeat business with existing clients. That means that a lot of the projects are very similar although unique in their own situations,” says Dwyer. “It allows us to maintain strong relationships with our supply chain partners, and we have built really strong connections with what is now a trusted group of like-minded businesses.”

REPEAT BUSINESS

Being able to traverse multiple complex projects is a result of dependability in roll out – something many others cannot match. Smaller players struggle at scale and larger businesses battle to keep a finger on the pulse.  “We are now in a position where we can use the same partners across multiple jobs, and that is again good for consistent quality delivery,” says Dwyer. 

Verde’s own story shows how adaptable and agile the company has been in its approach. An origin year spent on public sector refurbishments, alongside many similar projects, gave the company its grounding in building services. “Our first year involved more traditional M&E work, whether that was hospital or school refurbishments, and that required a different scope of work from our partners,” Dwyer recalls. “We are by no means moving away from that type of work, but we are looking to capitalise on what is in front of us right now which is the pipeline of work with local authorities who can take advantage of the funding that is available. Decarbonisation work, which is our main focus, has a slightly different set of requirements.”

The shift also needs the right base. Verde has now opened a satellite office in Liverpool, a creative and digital district close to the city centre. “We are also very pleased to announce the opening of our satellite office in Liverpool’s Baltic Triangle,” says Dwyer. “The new office gives us an even stronger presence in the city as we continue to work with clients and partners across the Liverpool City Region and play our part in some of the region’s major decarbonisation programmes.” 

Even though the drive for environmental improvement at scale is never easy, the wider backdrop is clear. Buildings are among the hardest parts of the UK economy to decarbonise, and public bodies have funding in hand and targets to meet. Delivery partners that can design, price and install heating, cooling and electrical systems to a high standard are in demand, and the contractors who hold the main contracts are quick to retain those that perform. 

Verde’s path from startup to trusted partner follows that logic. Main contractors get a single team that handles design, feasibility and build. Local authorities and universities get heating, cooling and electrical systems that cut carbon, and often cost, in buildings they already own. A pipeline stretching through 2027, PSDS4 on the horizon, a new city-centre office and a team that keeps growing all point in one direction. The company is growing quickly because the work it delivers keeps earning the next job, and for a family-run business from Liverpool, that is a strong place to stand.

Pin It on Pinterest

Share This